Monday, July 25, 2016

Foundation work starts

Tom from BHM was in today, laying the groundwork for the mostly landscaping features that encapsulate the front of the house.  It's a pretty big excavation, even though these are for non-structural patio walls... they won't be moving any time soon!


I had Tony in today to do camera inspections of the drains, and we were left wondering if the house uses an old septic system or not.  With some investigation with the very helpful Peel region building department, they are coming out to do a dye test tomorrow to confirm whether the collapsed/full sewage drain is draining to the city main or not... stay tuned!