Friday, August 5, 2016

Drain installation

Tony was in with his two trusted assistants, and man, did they have a hot day.  Even though we had done all of the channeling, they still had a lot of digging to get all of the drains in place and primed, and all of the stacks set up and connected to the floor drain pipes.  We now have a back water valve which is a nice bonus for this old house.


No comments:

Post a Comment