Thursday, October 6, 2016

Roof work

The tricky, slow process of framing (especially in a renovation) is the "set up".  Miguel got the new ridge beam, a massive three ply 16" deep LVL beam that weighs more than a small steel beam, installed and spent quite a bit of time making sure the existing roof was jacked up in some places and brought down in others.  There's a lot of history in that roof, and we are trying to get things integrated into the old roof as smoothly as possible.

It's nice to see some real progress in the house.  The next week or so should reveal the interior.