Tony was in with his two trusted assistants, and man, did they have a hot day. Even though we had done all of the channeling, they still had a lot of digging to get all of the drains in place and primed, and all of the stacks set up and connected to the floor drain pipes. We now have a back water valve which is a nice bonus for this old house.
No comments:
Post a Comment