You know the guys from Perola are here to stay when they show up with their little custom microwave box (you know... for lunches... and hopefully dinners!). We've got them here until they have the vanities, laundry and kitchen installed. Nice!
Tuesday, April 4, 2017
Monday, April 3, 2017
Closets!
Dermot's installer, Mike, arrived to install the closets today. I took a series of pictures to show the access provided to the built-ins with the Komandor doors...very nice!
Friday, March 31, 2017
Forming the planters
Thom has spent a good amount of time making sure the forms are perfect for the front planters. We now wait for a good weather window to pour.
Thursday, March 30, 2017
Glass and landscaping
Two late finish trades started today.... Rand installed the glass, while Thom was back to start the landscaping work in the front.
Wednesday, March 29, 2017
Nice enough to paint outside
Mick was back outside - this time pre-painting the 4" T&G pine boards for the undersides of the two porches. He has also removed all of the paper and Dave has been fastidiously testing out the central vac (pssst Dave...more dust bunnies to come!)
Monday, March 27, 2017
Nawkaw Stone and brick staining
Nawkaw has come and gone and they've left an amazing piece of work on the exterior. The brick and stone has been transformed to a consistent grey that really brings out the stonecutter colour on the garage doors and windows. What a great way to update older masonry; the product covers great, and because it allows the masonry to breath, it doesn't deteriorate like paint - thus the 20 year warranty on their work.
Saturday, March 18, 2017
Komandor Sliding Doors
Dave and Karen are using Komandor doors throughout instead of typical closet framing and interior doors. I find this approach is a much more modern and functional way to approach closets; and the range of door treatments they have are great.
Friday, March 17, 2017
The wall
Fred really knocked it out of the park on the fireplace wall. I love these concrete panels - looks fantastic.
Appliances
The leaning tower of Pisa (as Dave likes to call the fridge that appears to be very tippy) and friends arrived today...now where the hell is the kitchen?
Monday, March 13, 2017
Hodge podge day!
Luckily, Mick likes the electrician and plumber, or I'm not sure he would allow them in the house today. Tony's crew was working on showers, toilets and the hot water heater; Kevin was working on pot lights and plugs and Mick did the first coat of varathane on the stairs that were stained black on Friday - beautiful!
Friday, March 10, 2017
Thursday, March 9, 2017
Stair stain selection
Mick has prepared 4 or 5 stain samples and we've narrowed it down to a very dark black stain - it's going to look fantastic.
The windows are now done in the house - Mick used a special gel coating that he painted on the edges of the windows that allow him to spray the entire frame then pull the gel and paint right off for a nice clean finish.
Tuesday, March 7, 2017
Trim and door painting continues
While Thom's forming lumber arrived (the weather will determine when we can get started on the exterior planter walls), Mick and his trusty helpers keep going on the trim and doors inside.
Thursday, March 2, 2017
Busy day
Another busy day at the house. Tom finished off the stone, with the exception of a few patches; George's guys finished the central vac and the cool camera setup; and Mick was back after Adriano finished up to begin the interior trim painting.
Tuesday, February 28, 2017
Stone and tech
Thom has started patching up the stone in the front... it's going to look as good as old very soon!
Meanwhile, AIM Security was in to start the tech finishing tasks.
Thursday, February 23, 2017
Boxed windows
The box windows are being...boxed. We're adding a layer of rigid foam and low expansion foam in addition to the OBC requirement just to give a little stability to the window and eliminate voids between the jamb and the insulated framing around the window.
Wednesday, February 22, 2017
Adriano sets up
My trim carpenter, Adriano (AKA Oscar.... long story) has brought his crew and started the big job of getting the boxed windows and extended jambs throughout the house put in. He's got quite a bit of work to do for a house of this size.
Tuesday, February 21, 2017
Tile Progress
Freddy is in the house, thus the tile is progressing. He should have the majority of the work done this week and return later for the fireplace.
Thursday, February 16, 2017
Tuesday, February 14, 2017
Inside and Happy!
As the weather turns a little colder (but really, not that much!), Mick has started full speed on the inside of the house.
Saturday, February 11, 2017
Priming....outside?!?!
Fantastic winter (winter??) weather allowed Mick to get all of the priming done outside today. Crazy!
Friday, February 10, 2017
Trim and Doors Arrive
The single groove baseboards and casing arrived today from Victoria Strong (lol... the name always reminds me of when a finish carpenter of mine had to pick up some extra material, and called me from Sherway Gardens to discover that google had brought him to Victoria's Secrets).
The doors, though not well captured here, will be a great complement to the trim - with 4 horizontal grooves and once vertical groove along one side.