Showing posts with label Inspection. Show all posts
Showing posts with label Inspection. Show all posts

Thursday, November 17, 2016

Kitchen Arrives!

Psyche!  Well, close enough.  While waiting for the framing inspection (he stood me up...sniff), I outlined the kitchen location in preparation for the electrical work to begin.  This kitchen is going to be fantastic!


Wednesday, November 16, 2016

Inspection day!

We had the city HVAC and plumbing inspectors in today.  Tony walked through the water and drains and passed with flying colours, and Wayne from Pinewood went through the HVAC and all seemed good.... until - the inspector said he would look at the basement rough in during the insulation inspection.  This made no sense to me so I will have to investigate further [that is, once the insulation has been done, that would mean all of the boxing in of HVAC services in the basement will have been completed... a little late to change things at that point!].


Friday, September 23, 2016

Structural inspection

Lawrence, my trusted structural engineer, was in today to inspect the "advance work" as well as the three footings we will be pouring next week.  All was up to snuff, and we are good to proceed.