It was a fairly productive week at 955. The HVAC guys finished up their gas service, as well as rerouted some unsightly venting (the floor joists in the house are very full with plumbing and heating runs, so venting has been a challenge, luckily Jose from Pinewood met me onsite and we came up with a better solution to send the water heater and furnace vents up to the rear part of the roof).
Kevin started his electrical rough-in mid-week. He's got quite a bit of work ahead of him, but I'm confident that by the end of next week, we'll be in a good position on electrical and will be starting to think of getting the place insulated.
Showing posts with label HVAC. Show all posts
Showing posts with label HVAC. Show all posts
Thursday, November 24, 2016
Wednesday, November 16, 2016
Inspection day!
We had the city HVAC and plumbing inspectors in today. Tony walked through the water and drains and passed with flying colours, and Wayne from Pinewood went through the HVAC and all seemed good.... until - the inspector said he would look at the basement rough in during the insulation inspection. This made no sense to me so I will have to investigate further [that is, once the insulation has been done, that would mean all of the boxing in of HVAC services in the basement will have been completed... a little late to change things at that point!].
Friday, November 11, 2016
To the side
Juvee managed to get most of the South side done today. The work is a little painstaking, with set up being the biggest time suck.
Meanwhile, the boys are still inside working on the venting part of the HVAC installation.
Thursday, November 10, 2016
Back soffits complete
Juvee finished the back soffits today. While they still need paint, aluminum fascia and eaves, the goal was to get the house pretty closed in for the winter. Well, we're 1/4 of the way there!
Wednesday, November 9, 2016
Planning out soffit access
While HVAC continues to be roughed-in inside, Juvee arrived today to start planning out the crazon board, vented soffits. We had Mick give the sheets of crazon board a light grey primer coat, and Juvee spent most of the day today working out the sizing and setting up the scaffold so he could work in a safe environment at the back.
Tuesday, November 8, 2016
Fireplace x 2?
Ready for some heat? Hearth Manor was in today to install the beautiful double sided fireplace. This view is from the sitting room side, while the other side is from the stairs going down to the basement. Very cool!
Friday, November 4, 2016
Closed for business!
With the house now closed in and secure, work has now concentrated on the inside. We should be done with HVAC by early next week, after which we can bring the plumbers back and invite the electrician to start his rough in.
Wednesday, November 2, 2016
Working together
A multi-trade day again... we had the HVAC guys continuing inside...
....while Thom and his guys patched the brick areas and missing sills on the back and South side...
...while Virgilio finished up the skylight flashing and the chimney waterproofing on the roof.
Tuesday, November 1, 2016
Sangria Street here we come!
A lot of activity at the house again today (HVAC, plumbing, roof, concrete, deliveries...), but the most important part for Karen was the beginning of Sangria street...the concrete (then later, flagstone) front porch that will be a year-long hangout spot!
Monday, October 31, 2016
Wrapping up
The boys were at it again today. Tony and his team finished their drains rough-in and will be back to do the water services when the HVAC guys are done. Meanwhile, Junior was in to expertly apply housewrap to the exposed wood areas of the house. That will protect us over the few winter months so we can continue to work inside.
Friday, October 28, 2016
Moving along
Ted was in early to weld the various steel connections. This was a much needed step for Miguel to progress on some of the front framing.
Meanwhile, Tony slipped in to do some more rough in work. He had Rui and Mario with him all day so he was able to get a ton of work done.
Mid-morning, the HVAC guys arrived and started prepping their layout. We did a great walk-through and headed off some issues that were sure to arise... I'm sure there will be more next week - with HVAC, there always are!