Thursday, November 24, 2016

Rough-ins continue

It was a fairly productive week at 955.  The HVAC guys finished up their gas service, as well as rerouted some unsightly venting (the floor joists in the house are very full with plumbing and heating runs, so venting has been a challenge, luckily Jose from Pinewood met me onsite and we came up with a better solution to send the water heater and furnace vents up to the rear part of the roof).

Kevin started his electrical rough-in mid-week.  He's got quite a bit of work ahead of him, but I'm confident that by the end of next week, we'll be in a good position on electrical and will be starting to think of getting the place insulated.